Garissa, Kenya
Green Future✓ Verified ONLUS
72%
Latest update
Panels installed; the inverter is under testing.
Chosen by the Humapact team, one per organisation.

Garissa, Kenya
Green Future✓ Verified ONLUS
72%
Latest update
Panels installed; the inverter is under testing.
Beira, Mozambique
EduSeme✓ Verified ONLUS
52%
Latest update
Foundations complete; roofing is starting.

Agadez, Niger
Acqua Vicina✓ Verified ONLUS
75%
Latest update
Digging complete; the submersible pump is being installed.
Kaolack, Senegal
Radici Africa✓ Verified ONLUS
20%
No field update yet

Zomba, Malawi
Talea Verde✓ Verified ONLUS
15%
Latest update
Field visit done; figures and photos follow in the next report.

Ouahigouya, Burkina Faso
Sorgente✓ Verified ONLUS
34%
Latest update
The hydrogeological survey found water at 48 metres; drilling is booked for September.


Kisumu, Kenya
Radici Africa✓ Verified ONLUS
61%
Latest update
First harvest sold at Kisumu market.

Tambacounda, Senegal
Green Future✓ Verified ONLUS
31%
Latest update
Four of six pumps are running; the last two arrive in August.

Kaolack, Senegal
Talea Verde✓ Verified ONLUS
20%
Latest update
The first 1,200 seedlings are in their pots; the rains decide the planting date.

Ségou, Mali
Luce per Tutti✓ Verified ONLUS
64%
Latest update
Twenty-two posts are up; the market now stays open after dark.

Tamale, Ghana
EduSeme✓ Verified ONLUS
38%
Latest update
Shelving is built; the first 600 books arrived from Accra.

Musanze, Rwanda
Ponte Salute✓ Verified ONLUS
51%
Latest update
Walls are at roof height; the delivery-room slab is poured.


Addis Abeba, Ethiopia
HealthFirst✓ Verified ONLUS
25%
Latest update
The vehicle is fitted with a cold-chain fridge; the first route starts in July.
Mongu, Zambia
Ponte Salute✓ Verified ONLUS
31%
Latest update
The first cohort of 12 finished the six-week course.

Sokodé, Togo
Kora Insieme✓ Verified ONLUS
6%
Latest update
Four of six classrooms have light: evening classes have restarted.

Kara, Togo
Kora Insieme✓ Verified ONLUS
4%
Latest update
Wash-houses roofed and the committee trained: six women keep the rota and the fund. The committee's register counts 180 households served: at 5 people a household, the register's own average, that is 900 people.

Bassar, Togo
Kora Insieme✓ Verified ONLUS
1%
Latest update
Second-term fees paid; no drop-outs so far.

Kumasi, Ghana
Semi di Futuro✓ Verified ONLUS
72%
Latest update
All 60 girls sat the term exams; 57 passed.

Mekelle, Ethiopia
HealthFirst✓ Verified ONLUS
43%
Latest update
Building enclosed; furniture and the vaccine refrigerator are on the way.

Toliara, Madagascar
Talea Verde✓ Verified ONLUS
53%
Latest update
First 12,000 propagules planted with the village committee.


Bo, Sierra Leone
Luce per Tutti✓ Verified ONLUS
100%
Latest update
Panels are on the roof; the battery bank is being wired this week.

Kita, Mali
Talea Verde✓ Verified ONLUS
100%
Latest update
Both cooperatives finished the compost pits before the dry season ended.

Dodoma, Tanzania
Acqua Vicina✓ Verified ONLUS
100%
Latest update
All ten tanks are installed and the first rains filled them to 80%. 180 households draw from them: 900 people at 5 per household, the household size of Tanzania's 2022 census.
Gulu, Uganda
Skills4Life✓ Verified ONLUS
42%
Latest update
The first 80 participants have been selected.

Tamale, Ghana
Kora Insieme✓ Verified ONLUS
0%
Latest update
All fourteen villages visited at least three times: 3,200 antenatal visits to 1,080 women.

Lusaka, Zambia
Semi di Futuro✓ Verified ONLUS
100%
Latest update
Handover complete; the lab runs four classes a day.

Arusha, Tanzania
Talea Verde✓ Verified ONLUS
100%
Latest update
Final count: 25,000 seedlings distributed; the nursery now runs on its own sales.


Dapaong, Togo
Kora Insieme✓ Verified ONLUS
0%
Latest update
Fences and tanks ready at two schools; sowing in July.

Kampala, Uganda
Skills4Life✓ Verified ONLUS
40%
Latest update
Paused: the workshop space is being relocated; the course resumes once a new room is secured.

Huye, Rwanda
Sorgente✓ Verified ONLUS
50%
Latest update
Paused pending the district building permit.